LIM reports explained for Auckland buyers
A Land Information Memorandum, or LIM, is a council-issued summary of what the council knows about a property. For a buyer it is the closest thing to an official biography of the land and building. It is also easy to over-trust: a LIM is only as good as the council's records, and a clean-looking report does not mean a clean house.
This article sets out what Auckland's LIM covers, what it does not, and how to use it alongside a property file and a building inspection.
What a LIM contains
Auckland Council's page on property files and LIM reports says a LIM may include:
- safety placards (red, yellow or white) from rapid building assessments after an event where a state of emergency or designation is in place
- natural hazard information, such as erosion, subsidence or slippage, flooding of any type, or hazardous substances
- details of private and public stormwater and sewerage drains
- rates information, including any overdue rates
- building, plumbing and drainage, and resource planning consents
- notices, orders or requisitions affecting the land or buildings
- special conditions, including listings such as heritage designations
- information the council has received from another statutory organisation, and network utility information.
It is a summary, written from council records.
What a LIM does not tell you
The council itself says the property file is a different document, and that you should order both for a comprehensive view. The property file holds the building and resource consent documents and correspondence behind the summary. It only includes work the council knows about: if work was done without consent, it will not appear. The council also notes that a property file will not contain all regional consent documents from the former Auckland Regional Council, because many were never digitised.
That leaves several gaps a buyer must fill another way:
- Unconsented work. A deck, conversion or extension built without consent will not be on file. Compare the house to the consents, room by room.
- Physical condition. A LIM cannot tell you about rot, borer, leaks or a failing roof. That is what a building and pest inspection is for.
- Hazards on the particular site. Natural hazard information is what the council holds, not a site assessment. On a slope, in a flood-prone area or near a stream, consider a site-specific professional opinion.
Cost and timing
Fees and timeframes change, so check the council's LIM ordering page before you plan. At the time of writing it showed a standard LIM at $387 and an urgent LIM at $522. Standard LIMs take up to 10 working days, urgent ones up to three. The same page says a property file is $79 standard and $121 urgent, with the same timeframes. A 1.75 per cent payment fee applies to card payments.
Three practical points follow from the council's page:
- Working days are defined narrowly. They exclude weekends, public holidays and anniversary days, and any day from 20 December to 10 January. A LIM ordered in mid-December can take much longer than you expect.
- Processing starts the next working day after you submit the application.
- The LIM arrives as a link, not a document. The council emails a link and token key, and the link expires 28 days after issue. If it expires you need to apply for a new LIM and pay another fee, so download and save it straight away.
The council also warns that some third-party websites offer to order a LIM for you and may charge extra fees, and that it does not recommend or work with them. Use the council's own site.
Reading the red flags
The council's page on resolving LIM items lists the kinds of unresolved items that can cause problems for a sale. Look for these:
- Open resource consents. A status of "granted", "construction monitoring" or "ongoing monitoring" can mean a final inspection is still needed, information is outstanding, or the owner has continuing monitoring and maintenance duties. For regional consents with ongoing monitoring, the responsibility sits with the landowner and must be transferred to new owners.
- Requisitions. A requisition is a formal request for the owner to resolve a land or building issue that makes the property non-compliant. Reasons listed include unauthorised building work not carried out by the current owner, breaches of consent conditions, plumbing or drainage problems, and contamination or flooding. Requisitions always remain on the LIM, though their status is updated when they are resolved.
- Abatement notices and permitted activities, such as noise or rural land uses.
Why this matters: the council says incomplete requirements and related costs at the time of sale become the responsibility of the new owner. Buyers are advised to ask the seller to resolve items before settlement, or to agree in writing on whose responsibility they are.
A sensible order for buyers
- Order the LIM and property file as soon as you are serious, not after the offer is signed.
- Read the consent list and compare it with what you can see in the house.
- Flag every open consent, requisition and hazard, and ask your lawyer how each should be handled in the agreement.
- Commission a building inspection and, if the section is steep or low-lying, a site-specific report.
- If there is unconsented work, find out whether the seller will apply for a certificate of acceptance, and on what timeline.
Treat the LIM as a starting list of questions rather than a verdict.