Fixes worth doing before you sell an Auckland house
Most advice about preparing a house for sale is about presentation: fresh paint, tidy garden, decluttered rooms. Those help. But in Auckland, the fixes that affect price and the smooth running of a sale are often less glamorous: paperwork, moisture and anything a buyer's builder or lawyer will find. This list leans towards those, because they are the items that turn into negotiation, delay or a collapsed deal.
Start with what the council already knows
Before you list, order your own LIM and property file and read them as a buyer would. Auckland Council's page on resolving LIM items is blunt about why: unresolved items such as open resource consents, requisitions and abatement notices can cause problems when you try to sell. It adds that incomplete requirements and related costs at the time of sale become the responsibility of the new owner, so buyers are advised to ask the seller to resolve them before the sale completes.
A few specifics from the council's page:
- An open resource consent might mean a final inspection is still needed, the council is waiting for information, or there are ongoing monitoring requirements.
- A requisition is a formal request for an owner to fix a land or building issue that makes the property non-compliant. Reasons include unauthorised building work (even if done by a previous owner), breaches of consent conditions, and problems with plumbing or drainage.
- Requisitions stay on the LIM, but their status can be updated once the council receives evidence that the work was removed or complies.
Starting the process early matters because the council states that it can respond to LIM enquiries within 10 working days, with extra time possible when a site inspection is needed.
Deal with unconsented work
The most expensive surprise is a deck, conversion or extension built without consent. The government's Settled.govt.nz guide for sellers says you need to share all relevant information, including water-tightness issues, boundary problems and unconsented alterations, and warns you could face legal action later if you do not disclose serious issues. It also notes that most agency agreements ask you to confirm there are no undisclosed defects you are aware of, and that you must confirm the property has the necessary consents and code compliance certificates for building work.
You have two honest routes: fix it or disclose it. Auckland Council's certificate of acceptance process is the formal fix for unconsented work built from 1 July 1992. It is proof that the work meets the Building Code, but does not have the same value as an approved building consent. You will usually need a building report from a chartered professional engineer, registered architect or a registered or accredited building surveyor, so allow time and money.
If you decide not to regularise the work, discuss it with your agent and take legal advice before signing an agency agreement, as Settled.govt.nz recommends. Disclosing a known problem and letting the buyer price it is much safer than hoping it goes unnoticed. Also note that a real estate agent cannot disclose defects without your permission, and if you refuse, the agent must stop acting for you.
Close out consents
If you did consented work, check that a code compliance certificate was issued. Work that was consented but never signed off can leave an open item on the LIM and hold up a sale. Chasing a final inspection is much easier while the builder who did the job is still reachable.
Fix the moisture, not the stain
Fresh paint over a mould patch invites a buyer's inspector to take a moisture meter to it. Healthify's guide to damp and mouldy homes lists the common causes: leaks, plumbing faults, condensation, poor airflow. Its owner checklist is a reasonable pre-sale audit:
- Downpipes and gutters connected and discharging away from the house.
- No leaks under baths, showers or around appliances.
- Extractor fans and rangehoods vented to the outside.
- Damp patches on concrete floors or walls investigated.
- Damaged cladding and flashings repaired.
Where there is bare soil under a suspended floor, laying polythene as a ground moisture barrier is a standard measure; Tenancy Services describes it as the usual approach for enclosed subfloors in its moisture standard for rentals.
Safety items that cost little
Smoke alarms are an easy tick. Consumer NZ's guide says alarms should be photoelectric, on each level, in escape routes and within 3 m of bedroom doors. Replace any ionisation alarms and any units past their ten-year life. It is a small cost and shows that the house has been looked after.
Things that are usually not worth doing
Do not renovate a kitchen on the assumption you will recover the cost; that depends on the market and your price point, and a real estate agent can tell you what buyers in your street are paying for. Do not replace sound windows or cladding. Do not start work that might need consent just before listing, because incomplete work creates the very open items you are trying to avoid.
A practical order
- Order the LIM and property file, and read both.
- List every deck, extension, conversion and renovation, and match each to a consent and a code compliance certificate.
- Decide, for each gap, whether to regularise or disclose, with legal advice.
- Fix leaks, drainage and fans.
- Check smoke alarms.
- Only then think about paint.